The purpose of the operation is to provide its CB with an infrastructure suitable for operationality as it is housed in an infrastructure without the minimum operational conditions of its physical and human resources. This application meets the technical eligibility criteria of beneficiaries and the operation meets the defined general and specific eligibility criteria, with the expected implementation duration of approximately 12 months.