The project aims to minimise the occurrence of floods in the urban area of Sacavém, inserted in the Critical Zone of Loures and part of Odivelas in the river Trancão watershed, through the construction of a new section channeled to replace the existing one, whose flow capacity does not adjust to the tributary flows and a lifting station for rainwater in the area of Praça da República serving the lower Sacavém area.