The operation provides for: A) Cut of spontaneous vegetation b) reprofiling paths and requalification of floors to eliminate wheels c)Construction of intercrossing and turning zones d) reprofiling/opening ditches and paving of these e) Paving, in the Portuguese sidewalk of the path sections with the highest slope f) Construction of aqueducts g) Installation of signage h)Requalification of the sealing of the water point.