The operation provides for the refurbishment of the existing sewage treatment plant (introduction of a pre-treatment system) and the connection of existing and untreated networks in the subsystem (Casais Martanes, Almonda and Zibreira), as well as the construction of a new network in Videla and the expansion of existing networks to increase the coverage, contributing to the improvement of the quality of water bodies.