Start date: 17 March 2018
End date: 31 August 2020
funding
Fund: Cohesion Fund (CF)
Total budget: 706 748,44 €
EU contribution: 603 277,20 € (85,36%)
programme
Programming period: 2014-2020
Managing authority: Estrutura com a natureza jurídica de estrutura de missão, criada pelo Decreto-Lei n.º 137/ 2014 de 12 de setembro
intervention field
European Commission Topic

S. Martinho do Porto System – Alfeizerão Subsystem – Sewage Network of Vale Maceira

This application proposes to carry out the following operations, integrated in Typology 12 Urban Water Cycle:1.Alínea b), Wastewater Sanitation (SAR), namely:a)Construction of a collector and lifting duct b) Construction of two lifting stations.