Start date: 1 November 2016
End date: 31 December 2016
funding
Fund: Cohesion Fund (CF)
Total budget: 42 475,50 €
EU contribution: 36 086,69 € (84,96%)
programme
Programming period: 2014-2020
Managing authority: Estrutura com a natureza jurídica de estrutura de missão, criada pelo Decreto-Lei n.º 137/ 2014 de 12 de setembro
intervention field
European Commission Topic

Wall System – Construction of the domestic and rainwater network of Pedra do Ouro (SAR Vale Paredes)

The construction of this domestic sanitation infrastructure, realises the high/low connection, since the collection and transport, downward, will be carried out by the SMAs (as the managing body of the network) and the high (connection to the sewage plant) by ADLVT. 1036 ml of pipe and 73 branch offices will be built.

Flag of Portugal  Comunidade Intermunicipal do Oeste, Portugal