The construction of this domestic sanitation infrastructure, realises the high/low connection, since the collection and transport, downward, will be carried out by the SMAs (as the managing body of the network) and the high (connection to the sewage plant) by ADLVT. 1036 ml of pipe and 73 branch offices will be built.