The intervention in partnership includes the implementation of infrastructures in low drainage of waste water of the parish of Algeria and construction of infrastructures in high:6.65km of gravitic collectors in low 0.54 km of lifting ducts in low 2 lift station in low 1 lifting station in high 0.54Km of gravitic collectors in high 0.20Km of elevated ducts in high.