It consists of the extension of the Qta Damião Interceptor to interconnect the drainage network in low sanitation of Qta Vale da Loba to the section of the Interceptor of Qta do Damião, high network and the execution of two sections of network, in an extension of approx. 400 ml that will connect to the extension of the Qta Damião Interceptor to be built, corresponding to 20 household branches and 30 visiting boxes.