This operation aims to control and reduce losses by replacing duct sections over a length of 91.5 km, installation of control equipment (VRP’s) and measurement (flow meters), and the installation of a tele-management system to optimise the operation of equipment installed in water supply systems integrated into the Water System of the Alto Minho Region. The eligible investment is EUR 13,399.274,30.