Kohesio: discover EU projects in your region

project info
Start date: 29 November 2018
End date: 30 November 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 10 049 455,73 €
EU contribution: 6 328 239,44 € (53%)
programme
Programming period: 2014-2020
Managing authority: Estrutura com a natureza jurídica de estrutura de missão, criada pelo Decreto-Lei n.º 137/ 2014 de 12 de setembro
European Commission Topic

Interventions in water supply systems with the aim of controlling and reducing losses – Alto Minho Water System

This operation aims to control and reduce losses by replacing duct sections over a length of 91.5 km, installation of control equipment (VRP’s) and measurement (flow meters), and the installation of a tele-management system to optimise the operation of equipment installed in water supply systems integrated into the Water System of the Alto Minho Region. The eligible investment is EUR 13,399.274,30.

Flag of Portugal  Portugal