Start date: 16 December 2016
End date: 30 April 2022
funding
Fund: Cohesion Fund (CF)
Total budget: 2 996 160,65 €
EU contribution: 2 760 142,95 € (92,12%)
programme
Programming period: 2014-2020
Managing authority: Estrutura com a natureza jurídica de estrutura de missão, criada pelo Decreto-Lei n.º 137/ 2014 de 12 de setembro
European Commission Topic

Environmental Recovery of the Old Mining Area of S. Domingos – Phase 2

Interventions in the canals on the left bank of the S. Domingos river, namely channel 1 (the main channel for collecting runoffs from the slopes to the east of the S. Domingos stream), with 8.616 km in length, and in channel 2 (marginal secondary channel to the reservoir of Tapada de São Bento), with 0.856 km of extension, and complementary hydraulic works (hydraulic passages, protective structures in gabion and special protective structures).

Flag of Portugal  Multiple locations, Portugal