Start date: 28 February 2019
End date: 27 May 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 955 704,38 €
EU contribution: 812 348,73 € (85%)
programme
Programming period: 2014-2021
Managing authority: FM

Improvement of energy efficiency in the building at Mazā Lubānas iela 11, Riga

The aim of the project is to promote the improvement of energy efficiency in the building of the University of Latvia, Mazā Lubānas iela 11, Riga.1) the planned thermal energy savings after project implementation are not less than 294.63 MWh/year (40.27 %/year); 2) The planned heat consumption for heating after project implementation will not exceed 51.18 kWh/m² per year;3) planned reduction of CO2 emissions 87024 kg/year; Project total eligible costs EUR 955 704.38, incl. European Regional Development Fund support 85 % or EUR 812 348.72 and state budget funding 15 % or EUR 143 355.66.In accordance with energy audit and technical inspection of the building, it is planned to implement the following energy efficiency improvement measures in the building:1.Based constructions:-Insulation of the facade using the approach of the house; — Replacement of interlock fillings;-Insulation of brick palaces; —Insulating the windows from the outside along the perimeter, including under the windowsills (where it is physically possible);-Veco basement window replacement with PVC windows with a glass package with selective. Replacement of old doors against fireproof insulated metal doors;-Cokola insulation;-Jump insulation;- Dismantling of balconies that will prevent their connection to thermal bridges.2.Hot water system:-Installation of solar collectors for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Installed shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water production (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Instalating shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage 15 months from the signing of the agreement on project implementation.

Flag of Latvia  Riga, Latvia