Start date: 14 December 2018
End date: 13 December 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 359 810,00 €
EU contribution: 305 838,51 € (85%)
programme
Programming period: 2014-2021
Managing authority: FM

Energy Efficiency Improvement Measures The Emergency Medical Service in the Briges Support Centre building, Nīcgales iela 7, Riga

The Emergency Medical Service (hereinafter – NMP service) implements the project in the building at Nīcgales iela 7, Riga, where the NMP Briges Support Centre (hereinafter – BAC) is located. The tasks of the NMP service BAC are to ensure the work of NMP brigades, to ensure compliance with staff safety related requirements in BAC, to ensure the maintenance of qualification of BAC personnel, etc. High rates of heat loss of existing building envelopes and high electricity consumption, which are consumed for BAC’s needs, are more significant problems to be addressed within the project. The aim of the project is to improve the energy efficiency of the central heating from 216.47 kWh/m² per year to 89.58 kWh/m² per year (by 58.62 %) and the total energy efficiency of the building by 49 %, reaching 131.84 kWh/m² per year, by 131.84 kWh/m² per year by insulation of the facade walls of the building, the insulation of the base wall of the building block, the insulation of the building’s garage walls, the heating of the building floor, the overhanging of the floor, the insulation of the base walls of the building, the insulation of the building’s base wall, the heating of the building block, the overhanging floor heating, the insulation of the base wall of the building, the insulation of the building base walls, the insulation of the building blocks, the overhanging of the floor, the insulation of the roof above the floor, the insulation of the basic walls of the building garage, the insulation of the building’s base walls, the insulation of the building’s garage doors, the overhanging of the garage doors, the insulation of the base walls of the building, the insulation of the building’s base wall, the heating of the supercar floor, the overhanging of the floor, the insulation of the base walls of the building, the insulation of the building base walls, the insulation of the building block walls, the overhanging of the floor, the insulation of the base walls of the building, the insulation of the building’s basement walls, the insulation of the superstructure doors, the overhanging of the roof doors, the insulation of the basement walls of the building, the insulation of the building’s basement walls, the overhanging of the roof, the overhanging of the garage, the insulation of the main walls of the building, the insulation of the building base walls, the heating of the building block, the overhanging of the floor, the insulation of the roof above the floor, the insulation of the main walls of the building, the insulation of the building cell walls, By the time of submission of the project application, the building has been reconstructed energy certificate, as well as the technical survey opinion of the building was prepared, which allows to define the necessary project activities. The project will implement the following activities:1. Preparation of the documentation supporting the project. Within this activity the development of energy audit, technical survey opinion, development of construction project is carried out.2. Construction supervision. 3. Author supervision. 4. The execution of construction works. Within the framework of this activity are carried out: Building facade (brick) wall insulation, building base insulation, building garage basic wall insulation, building base wall insulation, overhanging of the heating floor, replacement of window windows, replacement of roof hatchways over garage, insulation of the roof over garage, replacement of windows, replacement of doors, heating system pipelines in the garage and replacement of heating bodies. 5. Publicity measures. Publication of information on the implementation of the project on the website of the NMP service, installation of an informative poster.The planned period of implementation of the project is 36 months from the conclusion of the agreement on project implementation.The total costs of the project are EUR 365081.50, where the eligible costs are EUR 359810,00, of which 85 % or EUR 305838.51 will be covered by the European Regional Development Fund and 15 % or EUR 53971.49 will be financed from the state budget. Indicator Unit Before implementation of the project After implementation of the project 1. Heat consumption kWh/m² 228,73 101,84 for heating and hot water 2. Heat consumption for heating kWh/m² 216,47 89,58

Flag of Latvia  Riga, Latvia