The aim of the project is to increase the energy efficiency of the vocational education competence centre “Riga State Technical School” at 1c Kr.Valdemāra Street, Riga, by improving the thermal performance of the building, reducing heat losses of the building through delimiting structures, increasing the durability of the building’s supporting structures and the life of the building. The activities planned within the framework of the project are directly aimed at the fulfilment of this goal, according to the developed construction project, the energy certificate of the building and the opinion of technical inspection of the building. The project is being implemented in accordance with RVT Development and Investment Strategy 2015. The year 2020. In order to ensure achievement of the specific objective defined in Regulations No 13 of the Cabinet of Ministers of 4 January 2018 "Regulations on implementing the second round of project applications of the Operational Programme "Growth and Employment" Specific Support Objective 4.2.1 "Promoting energy efficiency improvement in public buildings" 4.2.1.2 "Promoting energy efficiency improvement in public buildings" the SICC "RVT" plans to carry out the following construction works: .1 heat insulation of the attic division; .2 change of existing windows; 3. Change of existing external doors and creation of wind traps;4. improvement of thermal insulation of the internal heating system pipelines;5. installation of new radiators by installing thermo-regulating valves;6. reconstruction of a heating unit with heat exchanger installation;7. insulation of the building bases by restoration of the building’s hydroisolation and performing renovation of the basement walls. The location of the project – Riga (Riga planning region). Project implementation duration – from November 2019 to December 2021 (26 months in total). Total cost of the project – EUR 1 200 000.00, including European Regional Development Fund funding – EUR 1 020 000.00 and state budget co-financing – EUR 180 000.00. Based on the activities envisaged in the project, the implementation of the project will ensure improvement of the energy efficiency of the training block building SICC “RVT” by ensuring improvement of the thermal performance of the building facades, reducing heat losses of the building through its delimiting structures, increasing the longevity of the building’s supporting structures and the life of the building. The implementation of the project will ensure that the following results will be achieved: 1) Heat energy savings after project implementation will be no less than 30 % of the annual thermal energy consumption calculated in the energy certificate of the building prior to implementation of the project; 2) the heat consumption for heating after implementation of the project, on the basis of the calculations made in the energy certificate of the building and for the works envisaged in the technical design documentation, will not exceed 90 kWh/m² per year; 3. reduction in annual primary energy consumption: 266,08 MWh/year; 4) Estimated greenhouse gas reduction of 54.03 tonnes of CO2 equivalent per year.