The cost of the project is to design and construct the motorway section “Ieriķu Street – Vietalvas Street” (Mobile of the road; the road to the road is to be placed on the road; the road will be split from the streets to the streets of the city; the road will be shifted from the streets to the streets. Project resultsProject resultsThe result of the project is achievable monitoring indicators:- result indicator – by 31 December 2023, the average vehicle delay time has been reduced from 2.83 to 1.21 minutes (average decrease by 57.3 %);- the result indicator – by 31 December 2023 the total length of the transmission lines (including ramps) built by December 31, is reduced to the TEN-T network by 57.3 %; the result indicator – by 31 December 2023, is connected to the Riga-German network by the bridges of the city (incl. ramp) and the total length of the road connected to the TEN-T network within the framework of this project will be 0.8948 km.