Riga Technical University Agency “Riga Technical University Olaine College of Technology” is implementing the project “Improvement of study environment in Riga Technical University Agency”Riga Technical University Olaine College of Technology“”. The aim of the project is to improve the first level professional higher education STEM study environment at Riga Technical University Agency “Riga Technical University Olaine College of Technology”. Within the framework of the project 4 first level professional higher education study programmes will be modernised: Biotechnology (code: 41 524) Environmental protection technology (code: 41 850) Food Quality Control (41 541), Food Processing and Production Technology (code: 41 541) and 6 vocational secondary education programmes: Biotechnology (code: 33 524 021), Environmental protection (code: 33 850 00 1), Chemistry technologies and biotechnology (code: 33 524 00 1), Engineering mechanics (code: 33 521 02 1), Engineering mechanics (code: 35b 521 02 1) Food quality control (code: 33 541 031) The main activities to achieve the project goal will be reconstruction of the 1st and 2nd floors of Riga Technical University Agency “Riga Technical University Olaine College of Technology”, 11 laboratory development and improvement with equipment and equipment, as well as the library’s stocks and ICT will be purchased. The project’s activities are supplemented by the unbuilt classes of the building’s 2nd floor and the 3rd and 4th floors, as well as cosmetic repairs of sports halls and stairway premises, reconstruction of common spaces. 01.09.2017-31.05.2021 Place of implementation: Riga Technical University Agency “Riga Technical University Olaine College of Technology” Total project costs EUR 4 488 417.78, of which ERDF funding EUR 3 815 155.11 and state budget funding EUR 673 262.67 Rebuilt 1 and 2. Riga Technical University Agency “Riga Technical University Olaine College of Technology” floor, 11 laboratories, purchased equipment and equipment for laboratories, increased library stores and purchased ICT, reconstruction of 2nd, 3rd and 4th floor classes, as well as cosmetic repair of sports halls and stairway rooms, replacement of floors, replacement of doors, rebuilding of toilets.