Start date: 1 February 2018
End date: 31 December 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 14 228 677,00 €
EU contribution: 12 094 373,75 € (85%)
programme
Programming period: 2014-2021
Managing authority: FM
intervention field

Infrastructure development SIA “Liepājas Regional Hospital”, improving accessibility and quality of cardiology, oncology and child health care services in Kurzeme

Within the framework of the project it is planned to develop high-quality, cost-effective health care services by improving the infrastructure necessary for their provision at SIA “Liepājas Regional Hospital”, Slimnīcas iela 25, Liepaja, creating an appropriate environment for the provision of health care services in cardiology, oncology and child care and creating an appropriate environment for hospital staff.The project includes the following activities, which will be implemented in Liepaja Slimnīcas Street 25:1.Development of infrastructure within the framework of construction:1.1.Rebuilding and renovation of the premises within the framework of the project. Within the framework of the reconstruction it is planned to develop premises of the following structural units: Emergency medical department premises in the amount of ~ 2500 m², including the extension of the department for additional placement of observatory beds; Reconstruction of the outpatient department (doctor’s office) in the amount of ~ 450 m²; Reconstruction of functional diagnostic department, in an amount of ~110 m²; Relocation of a closed pharmacy during reconstruction of premises in the amount of ~ 660 m²; Reconstruction of physical therapy and rehabilitation department – ~ 2150 m², including 1st. C in case Z wing, as well as reconstruction of premises in casing 2 C, building a gym and doctor’s rooms; Reconstruction of the blood preparation department in the amount of ~ 210 m²; Reconstruction of the NMPD rental premises in the amount of ~ 120 m²; Moving the hemodialysis department to 1st C (existing Closed pharmacy), performing rebuilding of premises in an area of ~515 m², including construction (rebuilding) of water preparation in the basement floor of the C block; Reconstruction of palliative care/Chemicaltherapy department in the amount of ~350 m²; Reconstruction of the Children’s Department in the amount of ~ 800 m²; Reconstruction of the chronic patient care department in the amount of ~ 2000 m²; Reconstruction of the traumatology department in the amount of ~ 660 m²; Daily stationary reconstruction in the amount of ~ 660 m²; Reconstruction of the Cardiology Department in the amount of ~ 660 m²; Relocation of the Oral Diseases Division to Block A ~ 660 m².1.2 Infrastructure improvement, which includes the fitting of premises with medical equipment, household appliances, furniture and equipment, which is closely related to the purchase and assembly of the built-in medical equipment, as well as is an integral part for the full operation of newly built units. As part of the fitting-out of premises, it is planned to purchase the following items of equipment: Balmless baths, circular showers, mineral baths, medical consoles, consoles with reverse osmosis water connection (haemodialysis), washing disinfectant mother, Sharko shower consoles, underwater massage baths, water treatment equipment (osmosis-haemodialysis), sludge flux, sludge heater, fango kitchen equipment, pearl bath, manipulation lamp. 2.Purchase, supply and assembling of technologies involving the purchase of directly necessary technologies for the treatment process – 7 units: Anaesthetic equipment for operations, 2 pieces; Computed tomography equipment in the radiation therapy unit for topometry and simulation, 1 pcs; A set of videoendoscopy equipment for operation department,1pcs; Purchase of digital mamography equipment in functional diagnostic department, 1 pcs; Purchase of ultrasound equipment in functional diagnostic department, 1 pcs; A stationary digital X-ray equipment, 1 pieces.3.Information and publicity events, within which it is planned to promote the contribution of EU funds to the development of the hospital’s infrastructure by placing an information stand and a plate in the project implementation sites, a space plate and publications on the hospital’s website.The duration of the project implementation is planned 59 months from the signing of the contract on project implementation. The project was started on 01.02.2018. and is planned to be implemented until 31.12.2022. Total estimated cost of EUR 17 901 094.12, incl. ERDF contribution of EUR 12 094 373.75. As a result of the project, premises for provision of health care in cardiology, oncology and childcare will be rebuilt, as well as expanded Emergency Medical Unit. The improved infrastructure will provide an appropriate environment for patient treatment and staff work. As a result, patient flow and internal logistics will be carried out. Prior to the signing of the contract on the implementation of the project, the development of the Construction Project (purchase was announced on 10.11.2016, id.No. LRS 2016/31 and the purchase of technologies – anaesthetic equipment (purchase is announced on 20.10.2016, id.No. LRS 2016/29) of Endoscopy equipment (purchased on 10.01.2017. id.No. LRS 2017/1) and ultrasonography equipment (purchased on 06.06.2017, id.Nr. LRS 2017/11).

Flag of Latvia  Kurzeme, Latvia