The project will result in the construction of a manoeuvring area for de-icing, maintenance vehicles, snow alloy sites, rainfall, snow alloy and de-icing fluid discharge and monitoring systems, and an engine testing area. The runway and taxiways shall be extended, the cover structure shall be reconstructed and surveillance systems for patrolways and perimeter shall be established. The replacement of navigation systems and the strengthening of the surface within the safe area. Equipment for maintenance equipment is purchased.