Start date: 1 January 2016
End date: 31 December 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 45 255 508,00 €
EU contribution: 38 467 180,00 € (85%)
programme
Programming period: 2014-2020
Managing authority: Riigi Tugiteenuste Keskus, toetuste arendamise osakond
European Commission Topic

Stage II of the overhaul of Tallinn-Keila-Paldiski and Keila-Riisipere

The kapremont of the Tallinn-Keila-Paldiski and Keila-Riisipere railway lines is made at stations and on the necessary sections in a length of ~45 km. Replace the entire superstructure (ballast, rails, sleepers) and all main track turns, extend the embankment and increase the load capacity, repair the crossings (5), clean the waterfalls. Reinforced concrete sleepers with flexible rail fastenings are used for the repair of the superstructure. The combined welding of 60E1 type rails results in a rail with low noise and vibration levels.