As a result of the project, 50.7 km of railways will be reconstructed, including the use of long rails, the earthworks will be refurbished, the tracks will be replaced, the sleepers will be replaced, 6 switches will be reconstructed on the main road, 4 bridges and 13 railway tracks will be reconstructed, the level crossings will be replaced on 17 level crossings and an automatic traffic light system will be built on level crossing 3. During the works, 1 fully depreciated and dangerous viaduct will be demolished and 11 level crossings will be reconstructed. In addition, 1 new Valdeku stop point will be built with a 150 m platform and 1 new pass-by road will be built.