project info
Start date: 1 January 2016
End date: 31 December 2017
funding
Fund: Cohesion Fund (CF)
Total budget: 21 572 712,00 €
EU contribution: 18 336 806,40 € (85%)
programme
Programming period: 2014-2020
Managing authority: Ministerul Dezvoltarii Regionale, Administratiei Publice si Fondurilor Europene
beneficiary
European Commission Topic

Phase of the project EXTINDERING AND REABILITATION of the APA and used APA in the MARAMUREŞ JUDEMENT

General objective – improvement of water and wastewater infrastructure, in order to comply with the provisions of the Accession Treaty and the Directives in the sector. The aim – the project is to continue the works initiated by SOP ENV 2007-2013. By the phase notification it is confirmed that the documents (feasibility study, including the analysis of options and the results of the CBA, the environmental impact assessment, the institutional analysis, etc.) which formed the basis of EC Decision No C(2011)9065/07.12.2011, as well as the information communicated through the phase request (the body responsible for the implementation of the project, the investment and the place of implementation, according to the financing request assessed and approved by the COM, the total cost and total eligible cost, taking into account the requirements laid down in Article 61 of COM Regulation (EC) No 1303/2013, are maintained and are not such as to change the original purpose and objectives of the project as well as the results of the cost-benefit analysis. Please note that the phase-in request includes the estimated costs and this notification includes the costs resulting from the public procurement process, as the case may be. As regards indicator 2S29 and 2S30, related to compliant SEAU serving agglomerations with more than 10.000 p.e., i.e. between 2,000-10.000 p.e., it should be noted that the total equivalent inhabitants who will benefit from waste water treatment in accordance with the European Directives will be 104,500 l.e. for SEAU Baia Mare, 4.400 l.e. for SEAU Seini, 1000 p.e. for SEAU Sabisa, 8.100 l.e. for SEAU Viseu de Sus, 37.500 l.e. for SEAU Sighetu Marmatiei and 2,000 l.e. for SEAU Cavnic, respectively a total of about 0.76 % of total equivalent inhabitants in Romania (20798547 l.e. at 2014 level – data provided by ANAR) and a total of approximately 1.48 % of the equivalent population still required to be connected to centralised waste water systems at Romanian level (10630137 l.e. at 2014 level – data calculated on the basis of information provided by ANAR). The population that will benefit from the 6 extended/rehabilitation/constructed wastewater treatment plants is 157,500 equivalent inhabitants according to the provisions of the Financing Application. The wastewater treatment plant in Baia Mare will serve Baia Mare, Baia Sprie and Tautii Magheraus (Baita and Bozanta Mare); SEAU Seini will serve only the locality of Seini; SEAU Sabisa will serve only Sabisa; SEAU Viseu de Sus will serve only the locality of Viseu de Sus; SEAU Sighetu Marmatiei will serve only the locality of Sighetu Marmatiei; and SEAU Cavnic will serve only Cavnic. The value of the indicators related to CO18 “additional population benefitting from better water supply” and CO19 “additional population benefitting from better waste water treatment” is presented by reference to the needs of the water and wastewater system in the project area carried out in both phases, d

Flag of Romania  Maramureş, Romania