The project aims to continue and complete the works related to the abstraction, treatment, distribution of water in the localities of Carei, Negresti-Oas, Tasnad and Livada and the collection and treatment of waste water in the villages of Satu Mare, Odoreu, Paulesti-Ambud, Carei, Negresti-Oas, Tasnad, Livada, Ardud and Capleni, which were started under SOP Environment 2007-2013 and aimed at improving the water and wastewater infrastructure in Satu Mare county, both for the benefit of the inhabitants and the improvement of environmental conditions. The physical indicators for water supply systems are: • Rehabilitation of surface source abstractions – 3 pcs • drillings (new and rehabilitated) – 4 pcs • Rehabilitation of aduction networks – 4.6 km • Extension and rehabilitation of distribution networks – 13.3 km • New and rehabilitated treatment and chlorination stations – 2 pcs • SCADA systems – 2 pcs Physical indicators for waste water agglomerations and sewerage: • Extension of the sewerage network – 36.3 km (*) • Rehabilitation of sewerage networks – 4.5 km • New and rehabilitated wastewater pumping stations – 22 pcs • New and upgraded sewage treatment plants (155,000 per, 15,000 per, 10,000 per, 6,000 per, 5,000 per) – 5 pcs Note: (*) The length difference in the extension of the sewerage network in Odoreu, Ambud and Paulesti localities is due to a clerical error in Table 5 of the Phase request, the correct value being indicated in Table 3 of the Application, namely 11.2 km in Phase 2 for contract CL-08, therefore the correct total value is 36.3 km instead of 40.6 km. Project Components: — SM-CL-01: Third-stage extension of the wastewater treatment plant in Satu Mare municipality: Phase 2 of the Project comprises: Automation and SCADA works at all SEAU objectives; Ancillary and related works and final tests. — MS-CL-03: The rehabilitation of the drinking water treatment plant and abstractions in the city of Negreşti Oaș, the rehabilitation of the drinking water treatment plant in the city of Tășnad and the construction of a drinking water treatment plant and abstractions in the city of Livada Phase 2 of the Project include: for the Negresti-Oas and Livada STAPs – Delivery and installation of equipment from the chlorination station and from the technological flow (coagulation, flocculation, etc.); Ancillary and related works; Final tests. For the three captures: Civil works; Delivery and installation of equipment; Ancillary and related works. — MS-CL-04: The rehabilitation and extension of the wastewater treatment plant in the city of Negreşti-Oaş and the construction of a treatment plant in Livada Phase 2 of the Project include: Construction and installation works (20.39 %), functional equipment and equipment (53.09 %), installation (7.77 %) and related expenses related to works (design + landscaping, site organisation, tests, staff training, equipment – 18.76 %). — MS-CL-05: Construction works for wastewater treatment plants