The overall objective of the project is to improve the maritime transport system by upgrading the existing quay at berth 32 so as to allow direct berthing of ships and to increase the efficiency of ship loading and unloading operations. Thus, the main objective of the project contributes to the achievement of the specific objective of the Large Infrastructure Operational Programme, namely to increase the use of waterways and ports located on the TEN-T core network. The project contributes to the LIOP indicator 2S3 – Inland Waterway Goods through the activities foreseen.