The general objective of the project is the modernisation of the LEA 20 kV Parangu – Sadu 2B – Novaci and LEA 20 kV Carbunesti – Novaci axis in order to increase the distribution capacity for the takeover of power cut by low-power hydroelectric power plants in Gorj County’s N-E area. These medium-voltage electrical installations have as main function the distribution of electricity to the consumers in the area and the removal of electricity from the hydropower plants connected in these lines. The realisation of the project for the modernisation of the LEA 20 kV Parangu – Sadu 2B – Novaci axis and the LEA 20 kV Carbunesti – Novaci axis will lead to the achievement of the mandatory indicator at the level of the 2S54 project and the modernisation of the 110/20 kV Parangu, Carbunesti and Pojaru transformer stations from which the 20 kV lines are fed. Also, the modernisation of the LEA overhead power line of medium voltage 20 kV will lead to the achievement of the additional indicator, upgrading of 67.8 km medium voltage power lines. At the same time, the modernisation project LEA 20 kV Parangu – Sadu 2B – Novaci and Ax LEA 20 kV Carbunesti – Novaci contributes live to the result indicator of LIOP 2S53 – Gross production of primary energy from less exploited renewable sources, i.e. as a result of modernisation, an increase in gross production of primary energy from renewable sources is estimated by 14 GWh/year, from 10.53 GWh/year without project to 24.53 GWh/year with project, respectively an increase from 0.905 thousand toe/year in 2018 to 2,109 thousand tep/year in 2023. Project contribution in absolute values 2.109-0.905 thousand toe/year = 1,204 thousand toe/year. Considering that the reference value of the production of primary energy from less exploited renewable sources is 455,96 thousand toe/year, the contribution of the project in relative values 1.204/456.96*100 is 0.264 %. The achievement of this general objective can be achieved only by setting specific measurable, realistic and achievable objectives that will be pursued throughout the project implementation period.