Kohesio: discover EU projects in your region

project info
Start date: 18 May 2008
End date: 19 October 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 8 983 858,08 €
EU contribution: 7 636 279,37 € (85%)
programme
Programming period: 2014-2021
Managing authority: Ministerul Dezvoltarii Regionale, Administratiei Publice si Fondurilor Europene

Rehabilitation works for railway bridges, bridges and tunnels C.F. Cluj Regional Branch

The project of rehabilitation works for bridges, floors and tunnels (2 tunnels, 2 bridges and 8 bridges) managed by SRCF Cluj is proposed for financing within LIOP 2014-2020. The general objective of the project is established in direct correlation with OS 2.7. and with the actions selected for financing. The objective is to increase mobility on the TEN-T rail network or to make rail transport more efficient, commercialised and competitive, as appropriate. The railway structures covered by this project are located in the following counties: Bihor (1 bridge, 1 tunnel, 1 floor), Bistrita Năsăud (1 bridges and 2 bridges), Maramureş (1 tunnel), Salaj (5 bridges). Bihor County 1. Pod Km 651+ 564, CF 300, Bucharest – Ep. Bihor, between the stations Oradea East – Oradea – TEN-T Content 0.023 km 2. Tunnel km 598+ 930-599+ 201, CF 300, Bucharest-Ep. Bihor, between the stations Bratca-Suncuius –TEN-T Content 0.271 km 3. Flooring Km 597+ 715, CF 300, Bucharest – Ep. Bihor, between Bratca-Suncuius Stations --TEN-T Content 0,025 km Bistrița County – Năsăud 4. Flooring Km 41+ 719, CF 416B, Beclean – Ilva Mica, between Feldru – Ilva Mica Stations – TEN-T Principal 0.014 km 5. Floor Km 23+ 210, CF 422, Salva – Viseu de Jos, between Telciu – Fiad stations – outside the TEN-T network – 0.0033 km 6. Bridge Km 47+ 128, CF 418A, Beclean-Saratel, between Magherus-Saratel- TEN-T Stations Comprehensive – length 0.108 km Maramures County 7.Tunel km 239+ 679-239+ 731, CF 422A, Sighetul Marmatiei – Valea Viseului, between Bocicoi – Dream Valley stations – outside the TEN-T network – length 0.052 km Salaj County 8. Flooring Km 544+ 080, CF 300, Bucharest – Ep. Bihor, between Stana – Huedin stations – TEN-T Content 0.032 km 9. Flooring Km 544+ 677, CF 300, Bucharest – Ep. Bihor, between Stana – Huedin stations – TEN-T Content 0.038 km 10. Flooring Km 544+ 976, CF 300, Bucharest – Ep. Bihor, between Stana – Huedin stations – TEN-T Content 0.022 km 11. Flooring Km 545+ 100, CF 300, Bucharest – Ep. Bihor, between Stana – Huedin stations – TEN-T Content 0.028 km 12. Flooring Km 543+ 830, CF 300, Bucharest – Ep. Bihor, between Stana – Huedin stations – TEN-T Content 0.032 km For values in linear meters (ml) will be referenced the values in the documents approving the technical and economic indicators of the investment objectives. As regards the exact values of the predetermined output indicators and additional output indicators, the values in Annex 1.1 B will be taken into account.

Flag of Romania  Multiple locations, Romania