Kohesio: discover EU projects in your region

project info
Start date: 1 October 2020
End date: 31 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 4 719 739,20 €
EU contribution: 4 011 778,40 € (85%)
programme
Programming period: 2014-2021
Managing authority: Ministerul Dezvoltarii Regionale, Administratiei Publice si Fondurilor Europene

Development of Management Plans for protected natural areas ROSCI0114 (including natural reserves B.2. The swamp of Herghelia and 2.371. Grand Obanul and Movile Cave), ROSCI0191 (including nature reserve 2.358. Cave Limanu), ROSPA0066, ROSCI0281, ROSCI0293, ROSCI0340, ROSCI0353, ROSCI0412, ROSPA0057

The general objective of the project is to: Ensuring the favourable conservation status of species and habitats of Community and national interest from ROSCI0114 Hergheliei Swamp – Obanul Mare and Movilei Cave (including natural reserves B.2. The swamp of Herghelia and 2.371. Grand Obanul and Movile Cave), ROSCI0191 Limanu Cave (including nature reserve 2.358. Limanu Cave), ROSPA0066 Limanu – Herghelia, ROSCI0281 Cap Aurora, ROSCI0293 Costinesti – 23 August, ROSCI0340 Cuiugiuc, ROSCI0353 Cave – Deleni, ROSCI0412 Ivrinezu, ROSPA0057 Lake Siutghiol, within a consultative, open, transparent and participatory process aimed at developing management plans and informing/aware of stakeholders about the benefits of conservation of Natura 2000 sites and nature reserves. Through the area and the theme addressed (strengthening the management of Natura 2000 sites, developing the Natura 2000 Network in Romania and contributing to the implementation in Romania of Directive 92/43/EEC on the conservation of natural habitats and Directive 2009/147/EC on the protection of wild birds), this project will directly contribute to: achieving Specific Objective 4.1. of Priority Axis 4 of LIOP 2014-2020, namely “Increasing the protection and conservation of biodiversity through appropriate management measures and restoring degraded ecosystems”. Also, the implementation of the management plans for the sites covered by the project contributes to the achievement of indicator 2S36. Given that, in the process of drawing up the Management Plans, the concrete needs for the protection of biodiversity in the area of the 9 Natura 2000 sites and the 3 nature reserves that are the subject of the project proposed for funding will be identified, it follows that the Management Plans implemented will also contribute indirectly to: achieving the objectives of the EU Biodiversity Strategy 2020, the Natura 2000 Priority Action Framework, the National Strategy and the Biodiversity Conservation Action Plan 2014-2020. This project aims to implement an A-type action (developing Management Plans) for ROSCI0114 Hergheliei Swamp – Obanul Mare and Movilei Cave (including natural reserves B.2. The swamp of Herghelia and 2.371. Grand Obanul and Movile Cave), ROSCI0191 Limanu Cave (including nature reserve 2.358. Limanu Cave), ROSPA0066 Limanu – Herghelia, ROSCI0281 Cap Aurora, ROSCI0293 Costinesti – 23 August, ROSCI0340 Cuiugiuc, ROSCI0353 Cave – Deleni, ROSCI0412 Ivrinezu, ROSPA0057 Lake Siutghiol. In order to achieve the general objective, 3 specific objectives (set out below) were proposed, formulated in close connection with the activities foreseen in the project. In order to achieve each specific objective, one activity has been foreseen (see below). In addition, 2 activities of a general nature were foreseen: a needle

Flag of Romania  Multiple locations, Romania