Road II/534 deals with the connection of the settlement centre of the first group, the second subgroup of the city of Poprad and the centre of settlement of the third group, the second subgroup of the town of High Tatras and the adjacent municipalities in the western part of the Prešov self-governing region. It also connects to the I/18 and the international route E/50 (D1). The designed section is located on the road II/534 Poprad – Starý Smokovec, with the total length of road modernisation 5,273 km. Road modernisation consists of the replacement of damaged asphalt layers of the road, the modification of the intersectional junction and the reconstruction of the paved ditches and the streets. At the same time, it respects the existing directional and altimeter road management and does not require felling of stands. The modernisation of that section of the road together with the modification of the existing intersection of roads II/534 and III/3081 will ensure increased safety and fluidity of road transport in that road section. By reconstructing the road, the connection of the district town of Poprad to the town of the High Tatras, as well as the connection with the TEN-T route and the connection to international air and rail transport, will be speeded up in a natural way. Road reconstruction will increase driving comfort by reducing shocks and noise. The intersection of roads II/534 and III/3081 addressed will have an illuminated pedestrian crossing and an acoustic-psychological brake, which will increase road safety for motor and non-motor users. The implementation of the project also solves the establishment of bus stop lanes and follows the design of the project plan in SC 1.2.1. IROP “Online control of VOD and modernisation of dispatch control” and “Information systems for boarding and building a network of transfer nodes”.