The aim of the project “Modernisation of road III. Class 1113 Rohožník-Malacky” is the reconstruction of road III/1113 Rohožník – Malacky, through IROP under priority axis No.1: Safe and clean transport in the regions. Road III/1113 Rohožník – Malacky with connection to the D2 motorway, which belongs to the TEN-T core network within the ORIENT/EAST-MED corridor, is a key road communication between the district town of Malacky and the surrounding municipalities. The road is the fastest transport connection to the district town for the villages Rohožník, Sološnica, Kuchyňa, Plavecké Podhradie and Plavecký Mikuláš, i.e. for approximately 8.5 thousand inhabitants of the affected municipalities. The road is also of trans-regional importance as it represents the fastest connection to the D2 motorway for the villages Plavecký Peter, Prievaly, Cerová, Buková, Osuské and Jablonica in the Trnava region. In addition to individual passenger transport, the road is also used by freight and public passenger transport. Due to the unsatisfactory width structure of road III/1113, in 2011, freight traffic of more than 12 tonnes in the direction of Rohožník-Malacky was unidirectional. The situation is solved by a detour through the villages Pernek and Kuchyňa, which negatively affects about 2600 inhabitants of the mentioned villages. Road III/1113 is a strategic connection to the rest of the road network for several production plants of companies operating in the area. The key task of road III/1113 Rohožník – Malacky is, in particular, to ensure a rapid connection to the TEN-T and direct entry to the European Union’s Internal Market. The reconstructed road III/1113 between Malacky and Rohožník is the most beneficial link between the municipalities concerned in the region with the district town of Malacky and with the D2 motorway in terms of time and distance and thus also in terms of environmental impact. The modernisation of road III/1113 will reduce the operational costs for its repair and maintenance. In terms of measurable indicators, the aim of the project is to reconstruct 7,787 km of road and gain time savings in road transport on road III/1113 Rohožník-Malacky worth EUR 20897 towards the end of the project implementation, and this value increases annually in terms of the CBA.