Road II/575 solves the connection of the settlement center of the third group of cities Medzilaborce and Stropkov and adjacent villages in the north-eastern part of the Prešov self-governing region to the road I/15 and the international road E/371 (I/21).The section is located on the road II/575 Malá Poľana – Medzilaborce, with the total length of the section is 8.013 km. On the road II/575 the existing local slides are stabilised. Damaged road cover will be reconstructed, in some sections a complete subsoil replacement is designed. 5 bridge objects are reconstructed. Bridges 575-015 to 575-018 need to refurbish the upper and lower structures, restore the inoperable drainage of bridges and replace existing safety devices.Undesigned reconstruction of the bridge 575-020 consists of the refurbishment of the supporting structure and the lower structure of the bridge. The aim of the proposed reconstruction is to increase the safety and fluidity of road traffic, to increase the traffic comfort of road users, to extend the life of the building objects concerned and to improve the road drainage system.The result of the project is, in particular, the reconstruction and modernisation of the 8,013 km road II road and the 8,013 km road traffic time saving on the roads II and III, expressed in value of EUR 2863309 for the reference year 2014.