The project proposes construction modifications of the road II/555 as well as the complex reconstruction of the bridge in Stretava 555-003 (construction status VI). The road has been gradually refurbished and the KSK has systematically invested since 2005 in improving the parameters of this Class II road, using own budget resources, European Investment Bank loan resources, PPP projects and also EU resources. In the project, which is highly additive and synergistic to the above mentioned activities, it is necessary to solve the stabilisation of the road body in the slider area near the watercourse Latorica (the design of the structure came from the engineering and geological survey). Part of the reconstruction of the road body is in some sections also adjustment of unsatisfactory drainage, reinforcement of the edges, reconstruction of passes, complete modernisation of traffic signs and transport equipment (speed meters), installation of safety elements – guardrails. As well as the application of modern information systems – meteostation and instant speed indicator in the village Zemplínska Široká. At the same time, the entire length of the road will be equipped with so-called kilometres, which are essential for spatial orientation when driving on the road, as well as improving the recording of winter and summer maintenance performance as well as the work of rescue services. The project deals with the modification of exposed stops, for example in Michalovce near SPŠT with the application of protection elements for pedestrians (almost 30 thousand passengers per year). Stops in the villages Zemplínska Široká, Palín, Pavlovce nad Uhom and Veľké Kapušany