The result of the project is the reconstruction of 3 intersections. It includes the reconstruction of 2 intersectional crossings and the rebuilding of one intersection to the circular. These are the following intersections:· I/20 and III/3450 Prešov, ul. Rusyn – Arm.ge.Svobodu, junction· I/68 (I/20) Prešov Solivarská circular junction· I/18 Prešov, Levočská – Defenders of peace crossing, bridge The purpose of the proposed activities is to increase capacity, fluidity and safety (both pedestrian and automobile) and increase the permeability of the stopped and commercial area of the city of Prešov. The subject of the project is the reconstruction of 3.3586 km of roads I., III. class and local roads. A measureable indicator of the project is a total of 2,0571 km of Class I roads. Part of the construction solution is the replacement of road layers, the extension of the roadway, existing railway level crossings and bridge structures, including the widening arrangement of roads by completing turning and connecting lanes and transport islands. The solution will include modification and construction of access roads, entrances, paths, cycrotras, contact line and public transport stops.The main activists of the project cover several activities, sub-activities, and correspond to the solution of the 3 intersections included in the project. Preparatory and project work has been ongoing since 2008 and included the development of DSZ, DÚR, SAA (with parts of the SAA) and DRS. Project documentation processors will provide authorial supervision during construction. The project solution required the realisation of purchases of land and rent for a temporary project. The realisation of construction activities will be in the sense of the prepared project documentation for individual buildings. Construction works will be carried out by several contractors, which will be selected on the basis of the outcome of ongoing public procurements, within the planned period from 11/2017 to 03/2020 and under supervision of the construction supervision from the internal capacities of the applicant.The results of the project will be achieved through the implementation of the project’s main activities and support activities. The supporting activities of the project include:· internal project management, which provided and coordinated project preparation, public procurement and supervision of construction implementation; publicity of the project in accordance with the requirements of the Information and Communication Manual for mandatory tools of publicity of projects to inform the public about the project supported by OPII.