The implementation of the project “Modernisation of Vranovská Hospital a.s. to increase the productivity and efficiency of the provision of acute health care” will improve and increase the level of provision of acute health care. This is planned to be achieved by transforming the hospital, in particular by reconstructing the gynecological and obstetric department by rebuilding the old birth system by setting up birth rooms and subsequently equipping them with medical equipment. In the field of acute health care, the OAMIS cluster will be expanded to include an infectious section, as OAMIS is linked to an emergency intake (near CT and RTG workplace) and entry for critical patients is common to visits and patients arriving at pre-aesthetic ambulance. In addition to complex reconstruction modifications, the hospital plans to equip the radiological department, COS and JJAS with medical facilities. The subject of the project is eligible activities belonging to a group of eligible activities under specific objective 2.1.3 and are therefore fully in line with the objective: D) extension, superstructure, modifications and reconstruction of the interior and external spaces of existing buildings, f) supply of medical equipment, equipment and equipment, i) measures to improve the energy performance of buildings. The following measurable indicators will be achieved through the implementation of the project: Estimated annual greenhouse gas emission reductions – 5.429 t eqiv. CO2; Number of refurbished public buildings – 1; Number of upgraded acute general hospitals – 1, Floor area of refurbished public buildings – 864,43 m²; Reduction of annual primary energy consumption in public buildings – 34696.55 kWh/year. The project will be implemented in Vranovská Hospital, a.s. at M. R. Štefánik 187/177 B, Vranov nad Topľou 093 27.