Kohesio: discover EU projects in your region

project info
Start date: 1 July 2018
End date: 1 September 2021
funding
Fund: Cohesion Fund (CF)
Total budget: 1 320 200,00 €
EU contribution: 1 122 170,00 € (85%)
programme
Programming period: 2014-2020
Managing authority: Ministerstvo životného prostredia SR/ Sekcia environmentálnych programov a projektov
European Commission Topic

Krompachy, Hornád rkm 99,800 – reconstruction of hate

The project deals with ensuring the stability of the hate object with an operating level in the sense of the original project and the possibility of handling water levels by movable airlock devices, which aims to reduce the risk of flooding in a given area situated above the hate profile. By changing the fixed weir for mobile, it will be possible to ensure, especially in the case of flood flows, that the flooding of the village Kolinovce is minimised, with the protection of property estimated at approximately EUR 1 260 000 and by the number of inhabitants benefiting from the PPO measures, i.e. 2 persons. The building consists of the following building objects: With 01 hať-the main purpose of the reconstruction of the weir is to increase the flow capacity of the weir and repair damaged concretes. So 02 HORNAD -Realisation is based on the fortification of the bottom of the trough with quarry stone SO 03 inlet KANAL -Remanufacture of damaged concretes, cleaning and reconstruction work on the sampling object to the supply channel. Replenishment of damaged paving and repair of the retaining wall on the trough of the inlet canal. Repair of bet. structures, boarding threshold and service gangway on the helmet outlet of the supply channel. So 04 fishod -Remanufacture damaged concretes, complete reconstruction of the trough of the fish duct. So 05 EXTERNAL Fence -Implementation of the new fencing on the site of the original SO 06 ELECTROSS PARTIES PS 01 CONDITIONS FOR PRIEPADE HATE -Reconstruction work on parts of the operational file: Flap caps, Upper Level Measurement, Flap cap heating, Pressure air defrosting level, Provisional cap of hate PS 02 CONSTRUCTION ON PK -Reconstructive work on parts of PS 03 HEADING PUVES FOR helical outlet PK -With reconstruction, boards, transverse beams in front and behind boards, blood bars of lifting mechanisms, gearboxes with electric motors are dismantled. A new lower seat threshold of each board shall be built. PS 04 WHEELS FOR THE FOOD of the fish duct -Closing boards and vascular rods of the lifting mechanism will be replaced as part of the reconstruction. PS 05 ELECTROTECHNOLOGICAL PART

Flag of Slovakia  Banská Bystrica Region, Slovakia