Start date: 1 November 2017
End date: 1 November 2021
funding
Fund: Cohesion Fund (CF)
Total budget: 7 972 349,01 €
EU contribution: 6 776 496,66 € (85%)
programme
Programming period: 2014-2020
Managing authority: Ministerstvo životného prostredia SR/ Sekcia environmentálnych programov a projektov
European Commission Topic

Flood protection of the lower section of the Little Danube – Stage II

The subject of the application is one building – Increasing the security of the area against the backflow of the Little Danube and Klatovské arm from Váh, I. stage, which belongs to the group stavieb:Protipovodňová underground sealing wall LSOH Small Danube in km 5,600-11,000 (ZoNFP approved)Flood underground sealing wall LSOH Váh in km 27, 454-30,025 (SPF approved)Increasing the security of the area against the backflow of the Little Danube and Klatovské arm from Váh, Stage IIEnhancing the security of the area against the backsliding of the Little Danube and Klatovské arm from Váh, Stage II, Part 1, Increase the security of the area against the reversal of the Little Danube and Klatovské arm from Vah, stage II, 2nd part,Improving the security of the area against the backsliding of the Little Danube and Klatovské arm from Váh, Stage III, Komoča – river Nitra, sealing PSOH km 0,000-6,260 and LSOH km 0.490-6.490 of the river Nitra Condition of the functionality of the flood line consisting of a whole group of seven buildings is the completion of a continuous flood line on the right and left side of the Little Danube stream. After their completion, the buildings will provide flood protection in the region of the Little Danube stream and partly in the region of the Váh stream. In the construction, which is the subject of this application, we propose to increase the security of the area against the backflow of surface water from the Danube and the Váh by building a closed building on the Klátovské arm and its connection with the right-hand dam of the Little Danube and Klátovský arm, the construction of the HV connection and the modification of the crown of the dam above the Closed building. Appropriate observation and measurement equipment shall also be developed to monitor the effectiveness of the proposed modifications. The target group is the inhabitants of the region, which is adjacent to Klatovské ramen. Site of construction – Topoľníky. Cadastral area – Upper Topoľníky, Dolné Topoľníky. District – Dunajská Streda. VÚC – Trnavský. Flow – Little Danube, Klatovské arm. In the following periods, we plan to implement other buildings, which will result in a gradual increase and sealing of the protective dams of the Little Danube to a note of 114,00 m above sea level. The said gradual increase of the protective dams of the Little Danube is not the subject of this request for NFA. According to the Flood Risk Management Plan, the proposed measure covers geographical areas with 171 populations at risk. A measurable measure of the value of an asset protected from floods was quantified at EUR 4 716 086,17.

Flag of Slovakia  Banská Bystrica Region, Slovakia