The aim of the geological task is to ensure the remediation of environmental burdens on the sites of Kežmarok, Zlaté Klasy, Black Kľačany, which pose a high risk to human health and the environment. The specific objectives of the project are:- to obtain additional data for pre-sanction analysis of the risk of polluted area,- to prepare a pre-sanction risk analysis and, based on its results, to refine the project of remediation,- to eliminate the causes of the occurrence of selected environmental loads,- to limit the spread of pollutants in groundwater, soil and rock environments,- to eliminate contamination or reduce concentrations of pollutants in contaminated groundwater, soil and rock environments to the level of acceptable risk taking into account current and future land use,- ensure environmentally sound management of waste generated during remediation,- establish a monitoring system to monitor the effectiveness of remediation,- ensure the reclamation of the remediated site. The objective of the professional geological surveillance is, in particular:- checking the implementation of the project defined scope of remediation works,- checking the effectiveness of spent resources in relation to the required outputs of the project,- verification of documented data (results of updated risk analysis of polluted area, verification of calculations and models, cubatures, analytical results, hydraulic parameters, field work, remediation technology, etc.),- verification of achievement of the remediation limit. Each environmental burden will be assessed in detail. Remediation work and expert geological surveillance shall be carried out taking into account the specificities of the site, in particular with regard to the size and type of contamination, geological and hydrogeological conditions and taking into account the environmental and health risks posed by the site.The products included in the supporting documentation for the eligibility of expenditure are identified as being directly affected by the remediation. On these plots, the increased value of the properties was calculated after remediation by an independent expert. Parcels or parcels on which the remediation will not be carried out directly and their value remains unchanged are not included in the table (i.e. parcels with access communication, parcels with a hydrogeological monitoring well, etc.). In the light of the foregoing, there may be a situation where the parcels in question referred to in the remediation framework project and in the work plan to remove the environmental burden will not be identical to the parcel numbers listed in the table in Annex 4. The plots on which the buildings are located will not be subject to direct remediation as regards land remediation. The above plots will not increase the value of the property after remediation.