The subject of the present project is to reduce energy intensity in the Nesvady MŠ. The project deals with the reconstruction of the boiler room and heating, installation of solar collectors for the preparation of DHW, ventilation with recuperation, replacement of all fillings of holes, insulation of the outer shell, roof insulation, modernisation of lighting, repair of structures of external staircases and railings, dealing with the rehabilitation of moisture in brick structures of walls, replacement of plumbing elements, lightning, rainfall, as well as other construction and finishing mentioned in the project documentation and budget of the project. The target group for which the project was designed are families with small children. At the same time, there is an effort of the municipality to create a high-quality, pleasant and health-friendly environment for the users of the school. Another reason why the municipality decided to solve this project is the effort to behave environmentally and economically, since the building of the school was built in 1982 and currently does not meet the requirements of the minimum energy performance requirement.The main objective of the present project is to reduce the energy intensity of the MŠ building. The submitted project will solve measurable indicators, which were kept under code P0103, P0250, P0470, P0612, P0627, P0628, P0687, P0689, P0691, P0692, P0694, P0701, P0706, P0707 and P0084. Due to the limited character capacity in the description, it was not possible to provide full names of measurable indicators.