The aim of the project is the integration of the marginalised Roma community (MRK) in the village Blatný Remety into the social, economic and cultural life of the village and the overall improvement of the living conditions of the population of the village.Specific objective: Growth in the number of Roma households with access to improved housing conditionsMain activity: Support for improving access to drinking waterMethod of implementation: A. Construction and expansion of local water/pipelines distribution of drinking water to DN 150 including earthworks, pipe lines, fittings, inspection shafts, retrofit of roadways (only within the necessary width of the groove), adjustment of the surroundings of the drinking water dispensing point with paved surfaces and water drainage facilities. The local of the project implementation is part of the municipality Blatný Remety as an integrated separated Roma settlement, which is inhabited from more than 92 % of marginalised Roma communities, and which does not have access to drinking and useful water. The target group is MRC members living in the village and its immediate surroundings. The expansion of the water supply will make it possible to improve access of 417 members of CLLD to drinking and sanitary water. The completion of the water supply in Blatný Remety will have every resident of the municipality, which at that time has more than 92 % representation of MRK, the possibility of connection to the source of drinking and sanitary water.Measurable indicators of the project sú:P0156 – Number of persons of MRC with access to drinking water as a result of the implementation of the project – 417P0527 – Number of jobs created specifically for CLLD through the application of the social aspect in public procurements – 1