Kohesio: discover EU projects in your region

project info
Start date: 6 January 2018
End date: 7 January 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 221 312,70 €
EU contribution: 188 115,80 € (85%)
programme
Programming period: 2014-2021
Managing authority: Ministerstvo životného prostredia SR/ Sekcia environmentálnych programov a projektov

Renovation of the building of the municipal office and cultural house in Čakanovce

Our project is aimed at reducing the energy intensity of the building of the municipal office and cultural house owned by the village Čakanovce. The building in question does not meet the energy performance criterion of an administrative building within the meaning of the legislation in force. The building is energy-intensive for overall operation, especially in terms of heating and hot water. The outer shell of the building is without insulation, roof structures are in original condition, floors are without thermal insulation, the building does not meet the current requirements of the standard. The operational-disposal solution of the condition of the building does not meet hygienic requirements. Based on these facts, our priority is to implement such measures by which we will achieve the improvement of the thermal properties of the building, and so we will reduce the costs of maintenance and repair of faults related to the operation and construction of the building The main objectiveTo carry out the reconstruction of the building of the municipal office and cultural house in the village of Čakanovce in order to reduce the energy intensity and more efficient use of the building.  Specific objectives:1. Improve the technical condition of the municipal office building and the cultural house.2. Increase environmental protection by reducing pollutants.  3. Improve the quality of services provided to residents and visitors to the village. 4. Increase the aesthetic side of the building of the municipal office and cultural house.  Target group:- residents of the village Čakanovce,- employees of the municipal office, – visitors,- residents from surrounding villages. We will implement the project with the main activity Reducing the energy intensity of the public building. 8/2017-02/2018 Place of implementation: Čakanovce, parcel No.131/2 Measurable indicators:• Amount of electricity produced by the RES plant:  0 MWh/year • Amount of thermal energy produced by the plant OZE:12,15 MWh/year • Estimated annual greenhouse gas emission reduction: 2,02 t equiv. CO2 • Number of measures to reduce energy consumption implemented in a public building: 4• Number of public buildings at low or ultra-low or near zero energy levels: 1 • Floor area of buildings renovated beyond the minimum requirements:  415.99 m² • Energy consumption in the building after implementation of energy efficiency measures: 2.61 MWh/year • Energy consumption in the building before energy efficiency measures are implemented: 14.66 MWh/year • Reduction of final energy consumption in public buildings: 12050 kWh/year • Reduction of energy needs in public buildings: 61864.4 kWh/year • NOx reduction: 72.12 kg/year • Emission reduction of PM10: 13.12 kg/year • Reduction of SO2 emissions: 65.63 kg/year • Reduction of annual primary energy consumption in public buildings: 203598.7 kWh/year • Increased renewable electricity generation capacity: 0 MWe • Increased renewable energy generation capacity: 0.018 MW • Increased renewable heat generation capacity: 0.018 MWt

Flag of Slovakia  Košice Region, Slovakia