The proposed project concerns the design, supply and installation of power cables and fibre optic systems and commissioning, for two interconnections that will replace the existing interconnections of Livadi (N. Evia) — Andros and Andros — Tinos. The implementation of this project will achieve a significant improvement in the reliability of the interconnection of the Cyclades, as the interconnection of Livadi — Andros and Andros — Tinos is the second supply to the Cyclades from the mainland via Evia, and issues of environmental pollution due to hydraulic leakage of insulating oil on existing submarine cables will be resolved. The project is implemented by ADMIE as part of its obligations to ensure the supply of electricity to the interconnected system in a safe, efficient, reliable and environmentally friendly manner.