The project concerns the construction and operation of a solid waste treatment plant (composting plant) with a capacity of 6,000 tonnes per year of pre-sorted organic and green waste and b) a residual landfill site (HYTY) of Fokida Prefecture, with an annual capacity of an average of 20 000 tn/year and a total capacity of 362.487 m³ of non-hazardous solid waste. The construction of the HYTY achieves the safe disposal of municipal solid waste for the entire Prefecture. The construction of the composting plant contributes to the integrated management of urban solid waste (SWW) on the basis of the principles and targets set out in Law 4042/12 on waste, while it contributes significantly to the reduction of the volume of MSWs that are to be buried and to the achievement of the target of diverting the biodegradable fraction of MSW from burial (65 % w/w for 2020). The supply of bins for sorting at source and the supply of biodegradable bags is a prerequisite for the operation of the Composting Unit.