The PE Garafía II is projected on the Lomo Salvatierra in the Garafía TM, Island of La Palma._x000D_ It consists of four Enercon E44 wind turbines with a unit power of 900 kW, that is, a total of 3.6 MW._x000D_ The hub height is 55 meters._x000D_ It is connected to the Distribution Network at a voltage of 20 kV to support A500319_x000D_ The project has Administrative Authorization_x000D_ The energy generated is 10,174 MWh per year, which implies a reduction of 5,088,628 teq of CO2 annually.