The FGC extension in Sabadell includes the construction of a new section of a double-track railway line of 4.4 km in the north of the city, 4 new stations, the underground and reform of an existing station, and the construction of a train depot as the end of the line. In total, the action covers a length of 5.2 km._x000D_ Since September 2016, has been operating a first section of 1.5 km long of this extension, which includes two stations: the former Sabadell Estació, turned into Can Feu (Gràcia), which has been already moved underground, and Sabadell Plaça Major, which replaces the old Sabadell Rambla, which is at the moment without service._x000D_ The remainder action that includes 3.7 km line long and three new stations (Creu Alta, Sabadell Nord -which will be an interchange with the Barcelona-Manresa line from the Barcelona's suburban network and the Sabadell Parc del Nord station) is currently under execution._x000D_ The extension of the FGC in Sabadell is carried out through different construction projects: 1 of infrastructure, 3 of road and catenary, 2 of communications and non-rail tunnel installations, 3 of architecture and station installations, and 2 of signposting and enclaves._x000D_ The following actions are considered eligible under the Operational Program of the ERDF of Catalonia 2014-2020 for all the operations that are part of the aforementioned project:_x000D_ - Architecture and facilities of the stations_x000D_ - Signage and enclaves_x000D_ - Electrical power, communications and non-rail tunnel installations