The Project defines and evaluates the works necessary for the execution of the_x000D_ actions to improve the BI-630 between the intersection of Malabrigo (T. M. de_x000D_ Sopuerta) and Traslaviña (T. M. de Artzentales). Among the most relevant actions_x000D_ includes the provision of traffic calm measures and_x000D_ pedestrian connectivity to the passage of the road through the most urban sections of the_x000D_ trace. Specifically, 3 sections of sidewalk and semaphorised passage are designed to a_x000D_ demand to enable cross pedestrian connection between both_x000D_ margins, including the formation of bays for bus stops that_x000D_ allow connection with public transport._x000D_ The main objective is to ensure that the scope of the project_x000D_ has improved layout and reordered urban sections,_x000D_ favoring non-motorised movements. This is achieved by the following secondary objectives_x000D_: improve road safety by means of the_x000D_ adoption of traffic calm measures, reorder the pedestrian spaces and accesses_x000D_ and promote pedestrian connectivity with public transport by_x000D_ road