Action 1: Replacement of fluorescent luminaires with other LED ones._x000D_ Action 2: Installation of solar control vinyl sheets in the glazing of the building facing south and west._x000D_ Action 3: Replacement of the diesel boiler system with a 500 kW closed circuit geothermal installation, composed of 41 vertical wells of 150 meters in length.