The action consists in the construction of a cyclopeatonal footbridge to connect the Via Xurra over the Carraixet ravine to restore the original layout of the track. In addition, it includes the permeabilization of the service roads of Barranco del Carraixet under Line 3 of Metrovalencia and their adaptation to the connection with the CV-3002.