UNDER THIS OPERATION, THE FOLLOWING ACTIONS ARE CARRIED OUT IN THE LOGISTICS AREA OF ANTEQUERA, WITH AN INDICATOR OF 102 HECTARES OF ACTION: DEVELOPMENT WORK OF THE 1ST PHASE OF THE LOGISTICS AREA OF ANTEQUERA, WHICH HAS AN ESTIMATED BUDGET OF EUR 34 758,945.95, INCLUDING THE WORKS NECESSARY TO ENSURE THE ELECTRICITY SUPPLY (SUBSTATION AND POWER LINES) THIS AMOUNT IS FORMED AS FOLLOWS: CONTRACTUAL IMPLEMENTATION BUDGET: EUR 37.448,682.44. ELECTRICAL SUBSTATION: EUR 6.000.000.00. TOTAL EUR 43 448 682.44. ESTIMATED DECREASE (20 %) EUR 8,689,736.49. ESTIMATED AMOUNT OF ACTION EUR 34 758 945.95. TECHNICAL ASSISTANCE REQUIRED IN THE AMOUNT OF EUR 400 000. INTERMODAL TERMINAL WORK AMOUNTING TO EUR 8 440 000: THE INTERMODAL TERMINAL IS THE AREA OF THE LOGISTICS AREA WHERE THE MODAL EXCHANGE BETWEEN THE RAILWAY AND THE ROAD TAKES PLACE. IN THIS AREA INTERMODAL TRANSPORT UNITS, KNOWN AS SEMI-TRAILERS (SEMI-TRAILERS, SWAP BODIES AND CONTAINERS) ARRIVING BY ROAD, ARE TRANSFERRED TO FREIGHT TRAIN WAGONS AND VICE VERSA. IT CONSISTS OF A PART WITH THE RAILWAY INFRASTRUCTURE (TRAIN RECEPTION/DISPATCH ROUTES, NORMALLY ELECTRIFIED ON BALLAST, LOADING/UNLOADING TRACKS, AND MANEUVER HANDLES) AND A REINFORCED CONCRETE SLAB WHERE CONTAINERS ARE STACKED (LOADED AND EMPTY). THE WORK OF THE ANTEQUERA INTERMODAL TERMINAL, WITH AN ESTIMATED BUDGET OF EUR 8.140 000, WILL INCLUDE: CONNECTION TO THE RFIG (RAILWAY NETWORK OF GENERAL INTEREST). CONSTRUCTION OF RAIL ACCESS FROM ADIF RAILWAY FACILITIES. EXECUTION OF TWO ELECTRIFIED ROADS ON BALLAST OF 750 M IN LENGTH, WITH ESCAPE ROUTE EXECUTION OF TWO LOADING/DISCHARGE ROUTES EMBEDDED IN CONCRETE 750 M SIGNPOSTING, LIGHTING, FENCING AND ACCESS CONTROL ACTIONS OF URBANISATION AND ELECTRICAL SUPPLY STATION, BIDS AND PAID BY THE PUBLIC AGENCY OF ANDALUSIA PORTS, ALTHOUGH, WILL BE PASSED ON TO THE COMPANY PUERTO SECO DE ANTEQUERA S.L. THE AMOUNT THAT ACCORDING TO THE BASIC CONTRACT FOR THE INTEGRATION OF THE SOIL IN THE PROJECT OF TRANSPORT CENTER OF GOODS OF AUTONOMOUS INTEREST OF ANTEQUERA AND ITS ADDENDUM OF 2018, IS DUE TO THIS COMPANY. ACCORDING TO THE THIRD STIPULATION OF THE ADDENDUM, IT IS UP TO PUERTO SECO DE ANTEQUERA TO CONTRIBUTE 56.74 % TO THE ACTIONS NECESSARY FOR URBANISATION, AND TO THE PUBLIC AGENCY OF PORTS OF ANDALUSIA AT 43.26 %. THE WORK OF THE INTERMODAL TERMINAL CORRESPONDS TO APPA IN 100 %. THEREFORE, THE REGISTRATION OF THE OPERATION IS REQUESTED FOR EUR 29 282,574, CONSISTING OF THE FOLLOWING AMOUNTS: INFRASTRUCTURE: EUR 15,036,720 (43.26 % OF EUR 34,758,945). TECHNICAL ASSISTANCE: EUR 173 040 (43.26 % OF EUR 400 000). INTERMODAL TERMINAL: EUR 8,140,000. LAND PLOTS EUR 5 932 814, SINCE TO CARRY OUT THESE ACTIONS IT HAS BEEN NECESSARY TO ACQUIRE LAND, WHICH, ALTHOUGH INCLUDED AS AN ACTION OF THE OPERATION, ARE CONSIDERED INELIGIBLE BECAUSE THEY ARE OUTSIDE THE TEMPORAL SCOPE OF THE ACTION, AND ANOTHER TO BE FINANCED DIRECTLY BY THE PORTS AGENCY, ALTHOUGH THEY ARE INCLUDED AS AN INVESTMENT TO BE TAKEN INTO ACCOUNT IN THE FEASIBILITY STUDY PRESENTED FOR THE CALCULATION OF THE FINANCIAL ANALYSIS OF THE ACTION.