The actions undertaken in this project, located in the province of Cadiz, municipality of Los Barrios, are of two types: 1.- On the one hand, the aim is to define a road in the Technical Infrastructures area (Vial 2) in order to provide road access to this area and thus end the interior road infrastructure defined in the last amendment to the Los Barrios PGO definitively approved on August 8, 2016. This vial is configured as a road with two lanes of 4.5 m. each, plus a sidewalk of 2.5 m. on each side, ending in a roundabout that will give access to the plot of both the sewage station and that of the Electric Substation. 2.-. On the other hand, it is proposed to modify the existing road in front of the service building of the sector (Vial 3), aimed at increasing the provision of parking by 34 units, as well as for the creation of a loading and unloading area on the side of the building, which is much needed for proper traffic management in the sector. In total, the proposed operation represents an improved logistics platform area of 0.2 hectares.