The project consists of enabling the loading and unloading of fuel and supplies to vessels of greater draft and dead weight in the new dock annexed to Poniente dock. For this, the company plans to install a novel and innovative high-tech system that achieves substantial improvements in operations. The new facilities consist of reels where flexible hoses of 25 cm in diameter and 25 meters in length are rolled up; an aerial rack for the crossing of the pipes from the current points to the new dike, for which a span of 6 meters on the roadway will be used. Finally, an interconnection manifold is requested between the product lines from the aerial rack and the reels, where the manometer, thermometer and pressure switches are located.