As part of the operation, concluded and quality cycling links will be arranged between MČ and KS, i.e. the so-called “main axis” and the necessary “linking cycling infrastructure” of the following sets (length of cycling connections approx. 17.4 km):“MČ Tezno and MČ Tabor”(sections 1.1. and 1.3),“KS Razvanje and MČ Ivan Cankar” (section 2.1 and 2.2),“MČ Studenci and MČ Pobrežje” (section 4.1).In addition to the GOI, some of the obstacles (pillars, communal ducts) will be deployed, the necessary connections in the junctions and urban equipment will be set up.