Energy efficiency Complex projects: Energy optimisation of the supply technology of the Dresden-Neustadt City Hospital (Industrial Road and Weißer Hirsch site) according to the planning status of 20.08.2019(Measure 1: Upgrading of the engines and fans of selected RLT systems in houses H and K, measure 2: Refurbishment central CT system Building C with OP area,Measure 3: Partial centralised cooling, building K, C, R in house K, measure 4: Extension of Building Control Technology, Industrial Road,Measure 5: Construction of building control technology — meter concept, White deer,Measure 6: Replacement boiler for condensing boiler, White deer)