Kohesio: discover EU projects in your region

project info
Start date: 20 December 2018
End date: 31 October 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 374 300,00 €
EU contribution: 1 099 440,00 € (80%)
programme
Programming period: 2014-2021
Managing authority: Sächsisches Staatsministerium für Wirtschaft, Arbeit und Verkehr, Referat 28
beneficiary

Barrier-free design pedestrian and cycling tunnel Sonnenberg — 2. BA (Poverty Reduction — IP 9b)

Barrier-free design pedestrian and cycling tunnel Sonnenberg in the assisted area “ERDF — Chemnitz Downtown” — 2. BA: Replacement new construction of the supporting wall on Dresdner Str. with refurbishment of the stairway system including the installation of the ramp traffic area with the aim of upgrading the tunnel, which had previously been classified as a fear room, in a design and functional way in order to ensure a needs-oriented barrier-free connection for pedestrian and cycling traffic to the Sonnenberg (action field Poverty Reduction — IP 9b)

Flag of Germany  Chemnitz, Germany